Lee County Port Authority

Page Field Airport General Aviation Terminal Apron
  • Summary

    Location:
    Fort Myers, FL
    Size:
    603,000 sf
  • Share

A new 67,000 sq. yrds. (P-401 asphalt) GA Terminal Apron was constructed along with new taxiway tie-ins and a 15,625 sq. ft. Helicopter pad (P-501 concrete). New airside/landside access gate and fencing was installed. The existing electrical vault was upgraded and modified and guidance signs, bases and taxiway lighting were supplied and installed. Signage and airfield lighting was also installed with new wiring and conduit as required. The project included lake reconfiguration, storm water modification and clearing and grading of the site. Maintenance of all traffic including supplying and installing all barricades and supplying a security guard at the airside gate and constructing a temporary access road. Sod/seed and mulch of all disturbed areas completed the project.