all commercial projects
Commercial

Van Andel Institute

Van Andel Institute, Phase II
location
Grand Rapids, MI
size
240,000

This $178 million expansion was built on an extremely tight site in downtown Grand Rapids. The project contains approximately 90,000 sf of research lab space for bio-molecular cancer research and was built while the building remained fully occupied and operational. The new space also includes vivarium labs, private offices, conference rooms, large gathering rooms, a library, cafeteria and common space for approximately 400 additional employees.

Recipient of LEED Platinum for New Construction, sustainable construction practices included:

  • Recycling more than 75% of construction waste
  • Utilization of building materials with a high recycled content and utilization of locally manufactured materials to reduce transportation and greenhouse emissions.

Sustainable design features included:

  • A green roof
  • Storm water collection tank
  • Photovoltaic solar panels
  • Water efficient fixtures which reduce water consumption by 30%,
  • Heat recovery and energy savings through right sizing of equipment
  • A completely automated building control system to reduce energy consumption.

The project was completed one month ahead of schedule and $2 million under budget. O-A-K has been hired to manage several subsequent renovation projects at Van Andel Institute since completing this project in 2009.

Cert mark plat
Share
Van Andel Institute Phase II 1

I am delighted to report that O-A-K has been able to complete the expansion that more than doubles our space with literally no disruption to our existing operations...I unequivocally recommend O-A-K for your project.

Steven R. Heacock
Former CAO of Van Andel Institute