all k12 education projects
K12 Education

Forest Hills Public Schools

Project Next
location
Grand Rapids
size
36,500 sf
our role
Construction Manager

This $8 million, multi-phase renovation project included the transformation of a courtyard into a collaborative design center, renovations to 16 adjacent classrooms, renovations to a science laboratory and culinary arts learning space, and creation of a Maker Space and art room. The project was completed in 2 distinct phases, to allow school operations to remain ongoing and undisrupted.

This highly-collaborative, 21st-Century project, features several interdisciplinary components:

  • Whiteboard operable partition to create flexible spaces,
  • Two specific labs (chemistry and biology/physical science) to be utilized by all teachers,
  • Maker Space which adjoins an art room and industrial arts space into two connected spaces, and
  • Extended learning spaces to be used for small group projects or large group discussions
Share
IMG 7377