City of St. Petersburg

Albert Whitted Airport Runway 7-25 & South Connector Rehab

Role
General Contracting
Size
5,000 lf Runway
Location
St. Petersburg, FL
Markets
Aviation
Certifications
No items found.

Full Depth Pavement & Taxiway Rehab

Pavement rehabilitation required employing connector renovation methods from milling, pavement overlay to full depth reconstruction in accordance with the degree of pavement degradation along specific locations as shown on the plans and as directed by the Engineer. Additionally, geometry upgrades to the existing connecting south taxiways stubs and installation of new runway lights, illuminated signs and Precision Approach Path Indicators (PAPI’s) are also included in the scope of work. Selective pavement and electrical demolition, asphalt pavement,airfield lighting, grading, storm drainage, pavement markings, tie-downs, top-soiling and sodding.

No items found.
""

Similar Projects

Concourse A Concessions

Gerald R. Ford International Airport
View Project

RSW Cargo Ramp Rehabilitation & New Airfield Lighting Vault

Lee County Port Authority
View Project

General Aviation Terminal Renovations

Naples Airport Authority
View Project