O‑A‑K Nears Completion of Cape Coral Technical College Expansion

April 23, 2026
No items found.

Owen-Ames-Kimball Co. (O-A-K) is in the final stretch of construction on the 31,000-square-foot expansion of Cape Coral Technical College, located at 360 Santa Barbara Boulevard in Cape Coral. The project is on track to be completed in time for the fall 2026 school year and represents the first major addition to the campus since it opened in 1993.

The expansion will strengthen workforce training opportunities across Southwest Florida by providing hands-on education and industry-recognized credentials in high-demand skilled trades. At full capacity, Cape Coral Technical College will serve up to 500 students annually, preparing graduates for viable, family-supporting careers while helping address critical workforce shortages throughout the region.

Construction milestones achieved to date include:

  • Roofing completed
  • Interior and exterior painting underway
  • Exterior garage doors, man doors, and storefront installation completed
  • Interior electrical, HVAC, fire protection, and plumbing systems approximately 75% complete
  • Drywall hanging and finishing completed

The construction team’s goal is to receive the Certificate of Occupancy by July 1, allowing classrooms and specialized training labs to be fully equipped and prepared ahead of welcoming students in August.

“The expansion of Cape Coral Technical College represents a significant investment in the future workforce of Southwest Florida,” said Jim Hopper,  Florida Division President, Owen-Ames-Kimball. “Projects like this create real opportunity, giving students access to hands-on training that leads directly to meaningful careers while helping local industries meet the growing demand for skilled professionals. Owen-Ames-Kimball is proud to partner with the School District of Lee County on a project that will have such a lasting impact on students, businesses, and the economic future of our region.”

The expansion will introduce six new skilled-trades programs, including:

  • Construction trades
  • Welding
  • HVAC (heating, ventilation, and air conditioning)
  • Automotive repair and service
  • Marine service technology
  • Additional construction industry training programs

Developed in partnership with local industry leaders, the programs are designed to directly address workforce needs across Southwest Florida.

Key benefits of the expansion include:

  • More than 150 additional students per year gaining access to trade certifications
  • Many programs designed to be completed in approximately one year, allowing graduates to quickly enter the workforce
  • Expanded dual-enrollment opportunities, enabling high school seniors to earn industry certifications while still in school

“We’re proud to introduce postsecondary ‘blue collar’ skilled-trades training programs to Cape Coral for the first time. Our ‘Career in a Year’ model is designed to equip students with in-demand, practical skills while they earn recognized industry certifications. Each program culminates in a career certificate diploma approved by the Florida Department of Education, preparing graduates to enter the workforce quickly and confidently,” said Charlie Pease, Director, Cape Coral Technical College.

Cape Coral is one of Florida’s fastest-growing cities, and the region continues to face significant shortages of skilled workers in fields such as construction, marine service, HVAC, and automotive technology. The expansion will help build a local pipeline of trained technicians and tradespeople to support the area’s continued growth.

Upon completion, the expanded campus will stand as a lasting investment in education, economic mobility, and workforce development throughout Southwest Florida.

For more information about Cape Coral Technical College, visit www.capecoraltech.edu.

Owen-Ames-Kimball’s Florida operation is an affiliate of its parent company headquartered in Grand Rapids, Michigan, with offices in Collier and Lee counties. Its Lee County office is located at 11941 Fairway Lakes Drive in Fort Myers. Learn more about O-A-K at www.owen-ames-kimball.com or call (239)561-4141.

‍

"The expansion of Cape Coral Technical College represents a significant investment in the future workforce of Southwest Florida. Projects like this create real opportunity, giving students access to hands-on training that leads directly to meaningful careers while helping local industries meet the growing demand for skilled professionals. "
Jim Hopper
Florida Division President
Owen-Ames-Kimball

Related Stories

Building Where We Live: O-A-K Celebrates New East Lansing Office

Owen-Ames-Kimball Co. (O-A-K) recently opened the doors to our new Central Michigan office in East Lansing, welcoming guests to an open house celebration with Tom Shanley, Director of Central Michigan Operations and the rest of the team.

The new office is part of O-A-K’s growth plan and a commitment to the clients we already serve across the region. For Tom, the move is about more than expanding our footprint in Michigan. Like our teams in Grand Rapids, Kalamazoo, and Traverse City, the Central Michigan team will live and work in the communities it builds for.

“I think we do a better job with our employees if we work and live in the communities in which we serve,” Tom said. “It has to mean something to you. It has to be part of your world.”

The East Lansing space was chosen with our people in mind. Natural light fills the office, and there is room for the team to gather, collaborate, and host colleagues from other O-A-K offices for joint project work and group training sessions.

“Having a cohesive team is important to O-A-K,” Tom said. “It’s part of our culture.”

‍

November 9, 2026
Learn More

O-A-K Kalamazoo Breaks Ground on New Office

Last week, O-A-K team members, community leaders, and project partners gathered in Kalamazoo to break ground on our new Kalamazoo office. The building gives our Southwest Michigan team a permanent home designed around the way they work, collaborate, and serve clients across the region.

O-A-K first opened a Kalamazoo office in November 2013, starting with a small team in the historic Haymarket Building downtown. In 2024, we celebrated 10 years in the community. This new office is an investment in our employee-owners, our future in Southwest Michigan, and the community we are proud to call home.

Design partner Ghafari has helped shape a space that reflects who we are as a company and gives our team room to grow. Ghafari and O-A-K have a long history together, including our work on Ghafari’s own office in Grand Rapids.

Thank you to Ghafari, Western Michigan University (WMU), and Southwest Michigan First for their partnership and support, and to the leadership, project teams, and community representatives who joined us to celebrate.

October 29, 2026
Learn More

On Site at the New Forest Hills Aquatic Center

O-A-K Project Manager, Megan Wilson, and Cory Anderson, Director of Operations for Forest Hills Public Schools, walked the site to see how the district's new aquatic center is taking shape.

Located on the Dr. J. Michael Washburn Campus next to the Forest Hills Fine Arts Center, the project broke ground in December 2025 and is funded through the district’s 2023 bond, which voters approved in November of that year. Designed by TowerPinkster, the 77,813 sf facility features a nine-lane, 50-meter competitive pool and a four-lane, 25-meter community pool, giving the district the flexibility to run swim practices and community recreation at the same time. A separate dive well allows diving and swimming events to happen at once.

Those opportunities reach well beyond the district’s three high schools. The new center positions Forest Hills to welcome large events, from MHSAA state championship meets to national club swim meets, while expanding swim lessons, water fitness, and recreation for families across the community. The district’s current Community and Aquatic Center has served swimmers, athletes, students, and neighbors since 1990.

The aquatic center is one of several projects O-A-K is building alongside Forest Hills Public Schools, from school remodels to athletic facilities at each of the district’s high schools. “The partnership starts at design and goes all the way to completion,” Anderson said. “We spend a lot of time working together very closely to make sure these projects all come to fruition.”

O-A-K looks forward to turning over the new aquatic center to Forest Hills Public Schools in fall 2028.

Thank you to our video partners at Taproot Pictures for helping us tell this story.

October 27, 2026
Learn More