O-A-K hires Riley Fish, Andre Newsted, David Lamb, Tom Stepanovich, Tanner Wanzer, and Sam Moss.

August 8, 2016

O-A-K hires Riley Fish, Andre Newsted, David Lamb, Tom Stepanovich, Tanner Wanzer, and Sam Moss.

Play Video

(GRAND RAPIDS, MI) - Owen-Ames-Kimball Co. (O-A-K), local professional construction firm, announces the additions of Riley Fish as Project Manager, Andre Newsted as Cost Control Coordinator, and David Lamb, Tom Stepanovich, Tanner Wanzer, and Sam Moss as Carpenters. Five of the six positions were newly created in response to company growth.

Riley Fish, Project Manager, holds his Bachelor of Science in Construction Management from Ferris State University. He has over 10 years of experience in the field, with expertise in water well drilling. Riley was hired for a new Project Management position to assist with the firm’s growing workload.

Andre Newsted, Cost Control Coordinator, graduated from Grand Valley State University in 2016 with a Bachelor of Business Administration degree in Finance. Born and raised in West Michigan, Andre brings a passion for innovation and efficiency in the workplace.

David Lamb, Carpenter, brings 13 years of commercial construction experience in general trades and demolition. He holds his Asbestos Contractor/Supervisor License, Forklift Material Handling Certification, and several operator permits for aerial work platforms and mobile equipment.

Tom Stepanovich, Carpenter, has 5 years of industry experience, specializing in framing, electrical work, and construction estimating. Tom studied Biology and Chemistry at Western Michigan University and holds his AAADM (American Association of Automatic Door Manufacturers) and Boon Edam Certifications.

Tanner Wanzer, Carpenter, brings 5 years of commercial construction experience, with expertise in masonry, iron work, and steel fabrication. He is a certified Medical First Responder, and a Certified MIG Welder.

Sam Moss, Carpenter, specializes in finish carpentry. He has worked in the commercial construction industry for 30 years and holds certifications in First Aid and CPR training.

""

Related Stories

New Spaces for a New School Year at McGlone Academy

This summer, O-A-K completed renovations for Denver Public Schools at McGlone Academy, improving several of the spaces students use every day.

The work touched nearly every part of the student experience. In the cafeteria and kitchen, a new walk-in cooler and freezer will help support daily food service. In the theater, renovations and a new wheelchair lift make performances and assemblies more accessible. The gym received new athletic flooring, multi-sport court markings, and safety padding, while an additional classroom and storage space provide more room for learning and day-to-day school needs.

Behind the walls, O-A-K also upgraded important mechanical and electrical systems, including chilled-water pumps, electrical panels, and transformers, helping improve the reliability of the building itself.

With classrooms and hallways quieter over the summer, O-A-K's team got to work completing renovations throughout McGlone Academy before students and teachers returned. With the new school year underway, students came back to updated classrooms, a ready-to-use gym and theater, and the spaces they rely on throughout their school day.

August 21, 2026
Learn More

Through the Fence: Woodland Elementary Students Get a Look at Their New School

Woodland Elementary staff and students recently traded their classroom for hard hats. From a safe distance behind the fence line, they got a firsthand look at the jobsite where their new school is taking shape. The visit, known as a fence tour, was led by Anastasia Wojcik, project manager with Owen-Ames-Kimball Co. (O-A-K), and Jennifer Carson, principal at Woodland Elementary.

"It's great for them to be able to see the people on site, equipment moving around, and really get a sense of what's happening here," Carson said.

Teachers also used the visit to bring a classroom lesson to life, connecting the tour to a unit on area and perimeter.

The new Woodland Elementary is part of Portage Public Schools' Building the Future of Learning bond program, approved by voters in 2021. The building is being designed around an enchanted forest theme, with natural materials and abundant daylight. Learn more about the ground breaking here.

While construction continues, staff and students are temporarily housed at the former Haverhill Elementary building. Woodland is scheduled to open in fall 2027, the first of three new Portage elementary schools opening in three consecutive years, followed by Amberly in 2028 and Angling Road in 2029.

Thank you to our partners: Portage Public Schools, TowerPinkster, Plante Moran, Fielding International, and Video Partner Taproot Pictures.

August 12, 2026
Learn More

A Classroom Without Walls: The Grand Rapids Public Museum's New Riverfront

At the Grand Rapids Public Museum, learning now happens outside, right on the banks of the Grand River. The museum's new Riverfront brings an outdoor classroom and reopened public access to the water, so students and families can explore the geology, ecology, and history of the river in the very landscape they're studying.

The Riverfront is part of the museum's Expanding Curiosity mission, which takes learning beyond the gallery walls and out to the riverbanks. The broader project, funded through public-private partnerships, added overlooks, hands-on environmental exhibits, improved access to the water's edge, and a connection to the Grand River Greenway, an 85-mile non-motorized trail system.

Each summer, roughly a thousand children visit the museum, and many now spend part of their day along the riverfront. Nearby, a layered Geology Wall recreates six types of stone found in the ground beneath Kent County. Educators use it to talk about the history of the rapids and how the limestone was mined from the area, with the real strata visible in the wall behind them.

Just as important is what the space reconnects. For years, retaining walls cut the museum off from the river below. Now a sidewalk and stone steps lead down to the water's edge, opening the river back up to the people who come to learn from it. Groups gather to collect water samples and study the insects that live in the river, and visitors have already put the space to use for fishing.

Accessibility shaped the design throughout. Rather than a single accessible route, the space offers multiple points of access, giving every visitor the freedom to choose how they move through it.

The museum Riverfront is one of six current projects reshaping the Grand River, and Owen-Ames-Kimball Co. is proud to be part of three of them. Along with the museum, we, in collaboration with the City of Grand Rapids and Viridis Design Group are building Canal Park, opening in late fall, and the East Riverfront Park near the new Acrisure Amphitheater, now in Phase II. Both add kayak launches and river access that this stretch of the Grand hasn't offered in generations, opening the water back up to the community.

Video by Taproot Pictures

August 4, 2026
Learn More