MARCH 3, 2021

2021 Construction Tour: Van Buren ISD

This addition and renovation project marks a unique partnership between the Van Buren Intermediate School District (VBISD) and the Van Buren/Cass District Health Department (VBCCHP). The dream was made a reality after two years of planning and collaboration, as a response to community needs for dental services and professional training in the health sector.

The multi-purpose expansion to Van Buren Tech’s existing two facilities features:

  • A new two-story, 25,000 sf Community Health Center with a fully functioning dental office and classrooms for vocational training,
  • And a 6,800 sf “Main Street” connector building that will bring the three buildings together and feature lofted ceilings, collaboration spaces and a café/bistro.

So, their vision really was to enclose this area completely, and allow people to be able to connect with all the programs.

Tom Stanek
Director of Kalamazoo Operations, Owen‑Ames‑Kimball Co.

In Other News

01 GRR Museum v2 00 01 00 17 Still010

Engineering Day at the Grand Rapids…

Engineering Day at the Grand Rapids Public Museum Video

Grand Rapids Public Museum recently held an Engineering Day…
Steve Mc Caskey Recognition

Steve McCaskey Receives Certificate of…

Steve McCaskey Receives Certificate of Appreciation from Allegan Area ESA Board of Education

At O‑A‑K, we believe that “building the best experience”…
IMG 3767

Grand Rapids Public Museum Engineering…

Grand Rapids Public Museum Engineering Day

O‑A‑K is currently partnered with Grand Rapids Public…
001 thr 5518 twilight

Pikes Peak School Entry Addition

Pikes Peak School Entry Addition

Completed in 2023, this 1,300 sf addition to the school…
Bryce Juan Jr V3 00 01 00 00 Still007

Preconstruction Efforts with O‑A‑K…

Preconstruction Efforts with O‑A‑K Project Managers

Curious about what goes on before construction starts?…
01 Zeeland East West HS Final v1 00 01 15 16 Still021

Zeeland East and West High School…

Zeeland East and West High School Athletic Updates

Join athletic directors Josh Glerum and Jordan Bandstra on…
01 Final v1 00 01 22 04 Still010

Godfrey Lee Public Schools Lee High…

Godfrey Lee Public Schools Lee High School Restoration and Expansion

Following a structural failure in 2019, Godfrey-Lee Public…
02 Final v1 00 00 13 18 Still002

Kalamazoo College Campus Electrical…

Kalamazoo College Campus Electrical Upgrades

Kalamazoo College is modernizing its' electrical system,…
01 EK Culinary Final v1 00 00 57 19 Still011

East Kentwood Culinary Arts Ribbon…

East Kentwood Culinary Arts Ribbon Cutting

Kentwood Public Schools students now have the opportunity…
Thornton Walk Thru Juan Sr 00 00 04 21 Still001

Shooting Range Construction Tour

Shooting Range Construction Tour

O‑A‑K Superintendent, Juan Martinez Sr., shares what goes…