O-A-K Celebrates 125 years in Grand Rapids

May 23, 2016

O-A-K Celebrates 125 years in Grand Rapids

Play Video

(GRAND RAPIDS, MI) – Owen-Ames-Kimball Co. (O-A-K), local professional construction firm, announces their 125th anniversary in West Michigan. The firm, founded in Grand Rapids in 1891, currently employs a professional staff of 160, and operates full-service offices in Grand Rapids, Kalamazoo, and Fort Myers. Click here for photos from the anniversary celebration on Thursday, May 19th.

HISTORYWhen O-A-K was founded in Grand Rapids in 1891, the city limits included less than 10 square miles, the majority of streets were unimproved dirt roadways, and the primary mode of transportation was the horse drawn carriage or wagon.

“The city has grown and changed so much since 1891, when we were founded. To be a part of that change, even in some small way has been an honor for current and past O-A-K employees. One thing that hasn’t changed is our commitment to downtown Grand Rapids and West Michigan. We are proud of our past contributions and look forward to the next 125 years,” said Frank Stanek, Corporate President and Chief Executive Officer. Stanek is the eighth CEO to hold this position throughout the firm’s history, and is notably the youngest to take on the role.

Among the company’s most recognizable projects in Grand Rapids are:

  • Frederik Meijer Gardens and Sculpture Park
  • Grand Rapids Public Museum
  • Grand Rapids Civic Theatre
  • Grand Rapids Public Library (originally built by O-A-K in 1904, added onto in 1967, and historically restored in 2003)
  • McKay Tower (originally built by O-A-K in 1916 and renovated in 2013)
  • Numerous projects at John Ball Zoo

“West Michigan is very blessed to have such a strong philanthropic backbone as the driving force in transforming our community. This transformation has provided us opportunities to be involved with and engaged in projects that have become nationally recognized. This is something that really makes Grand Rapids special,” added Stanek.

TODAYWhile O-A-K focuses the majority of their business within the local geographic regions of West Michigan and Southwest Florida, they have also completed projects for locally-based organizations in 39 of the 50 United States. Their Florida operation began in 1982, and the Kalamazoo office was launched in 2013. The firm’s average annual volume over the past five years is $150 million, and the majority of their projects are overseen using the Construction Management delivery method, a more professional-based approach than traditional General Contracting. O-A-K was one of the pioneers of Construction Management delivery in West Michigan, tracing back over 100 years.

LONGEVITYIn addition to the company’s corporate longevity in West Michigan, the longevity of their individual team members also contributes to their continued success.

“Our values are at the center of our organization. This is a major factor in why our people stay with O-A-K for their entire careers.” Stanek said.

Factors that demonstrate this longevity include:

  • One third of current employees have been with the firm for over 20 years, even though O-A-K has hired 23 new employees since January 2015
  • The average O-A-K retiree has been with the company for well over 30 years
  • The company has been employee-owned since 1891, supporting an inherent checks and balances system when it comes to major corporate decisions
  • The average O-A-K field employee has been with the company for 23 years

“Periodically we run into someone whose mother or father, or grandpa, or great grandpa worked for O-A-K. We love digging through our historic archive of personnel cards to give to these people as keepsakes. Being part of the community for so many years means we’ve touched a lot of people along the way,” added Stanek.

CELEBRATIONOn Thursday, May 19th, the company welcomed over 400 guests at their yard location off of U.S. Highway 131 in downtown Grand Rapids. Attendees included current and past employees, clients, trade contractors, and general area business partners. The cuisine featured a casual barbeque menu, custom-made cookies from a local bakery, and a make-it-yourself macaroni and cheese bar. Décor was also kept casual, in keeping with the company’s low-key corporate mentality, showcasing historic signage and O-A-K field equipment.

“We want to sincerely thank everyone for the part they play in our continued success,” Stanek commented, “plus, it wouldn’t be a birthday without a party!”

COMMUNITY COMMITMENTAs the community component of the company’s anniversary celebration, O-A-K launched a year-long service initiative called Hard Hats, Strong Hearts in May. Overseen by a committee of nine employees, the purpose of the service initiative is to organize and implement volunteer events throughout the year, impacting local families and organizations in need. All local O-A-K employees are members of a team overseen by a committee member, and given the opportunity to help with projects that best suits their skill sets and passions. All events have been developed with employee input and will continue throughout the year.

Events scheduled for the first month of launching include:

  • May 18th - Grand Rapids Home for Veterans – Volunteering at Fishing Derby
  • May 18th - Habitat for Humanity in Kalamazoo – Volunteering skilled trades on a current building project
  • May 20th - Repairing and replacing the exterior siding of a home for a local family in need
  • May 26th - Repairing and improving exterior pergola and landscaping for a local family in need
  • June 26th – Volunteering at Gilda’s Club’s concession stand at the LPGA Classic

​###

Media Contact:Rachael MartemucciMarketing ManagerOwen-Ames-Kimball Co.(616) 456-1521rachaelm@oakmi.com

""

Related Stories

New Spaces for a New School Year at McGlone Academy

This summer, O-A-K completed renovations for Denver Public Schools at McGlone Academy, improving several of the spaces students use every day.

The work touched nearly every part of the student experience. In the cafeteria and kitchen, a new walk-in cooler and freezer will help support daily food service. In the theater, renovations and a new wheelchair lift make performances and assemblies more accessible. The gym received new athletic flooring, multi-sport court markings, and safety padding, while an additional classroom and storage space provide more room for learning and day-to-day school needs.

Behind the walls, O-A-K also upgraded important mechanical and electrical systems, including chilled-water pumps, electrical panels, and transformers, helping improve the reliability of the building itself.

With classrooms and hallways quieter over the summer, O-A-K's team got to work completing renovations throughout McGlone Academy before students and teachers returned. With the new school year underway, students came back to updated classrooms, a ready-to-use gym and theater, and the spaces they rely on throughout their school day.

August 21, 2026
Learn More

Through the Fence: Woodland Elementary Students Get a Look at Their New School

Woodland Elementary staff and students recently traded their classroom for hard hats. From a safe distance behind the fence line, they got a firsthand look at the jobsite where their new school is taking shape. The visit, known as a fence tour, was led by Anastasia Wojcik, project manager with Owen-Ames-Kimball Co. (O-A-K), and Jennifer Carson, principal at Woodland Elementary.

"It's great for them to be able to see the people on site, equipment moving around, and really get a sense of what's happening here," Carson said.

Teachers also used the visit to bring a classroom lesson to life, connecting the tour to a unit on area and perimeter.

The new Woodland Elementary is part of Portage Public Schools' Building the Future of Learning bond program, approved by voters in 2021. The building is being designed around an enchanted forest theme, with natural materials and abundant daylight. Learn more about the ground breaking here.

While construction continues, staff and students are temporarily housed at the former Haverhill Elementary building. Woodland is scheduled to open in fall 2027, the first of three new Portage elementary schools opening in three consecutive years, followed by Amberly in 2028 and Angling Road in 2029.

Thank you to our partners: Portage Public Schools, TowerPinkster, Plante Moran, Fielding International, and Video Partner Taproot Pictures.

August 12, 2026
Learn More

A Classroom Without Walls: The Grand Rapids Public Museum's New Riverfront

At the Grand Rapids Public Museum, learning now happens outside, right on the banks of the Grand River. The museum's new Riverfront brings an outdoor classroom and reopened public access to the water, so students and families can explore the geology, ecology, and history of the river in the very landscape they're studying.

The Riverfront is part of the museum's Expanding Curiosity mission, which takes learning beyond the gallery walls and out to the riverbanks. The broader project, funded through public-private partnerships, added overlooks, hands-on environmental exhibits, improved access to the water's edge, and a connection to the Grand River Greenway, an 85-mile non-motorized trail system.

Each summer, roughly a thousand children visit the museum, and many now spend part of their day along the riverfront. Nearby, a layered Geology Wall recreates six types of stone found in the ground beneath Kent County. Educators use it to talk about the history of the rapids and how the limestone was mined from the area, with the real strata visible in the wall behind them.

Just as important is what the space reconnects. For years, retaining walls cut the museum off from the river below. Now a sidewalk and stone steps lead down to the water's edge, opening the river back up to the people who come to learn from it. Groups gather to collect water samples and study the insects that live in the river, and visitors have already put the space to use for fishing.

Accessibility shaped the design throughout. Rather than a single accessible route, the space offers multiple points of access, giving every visitor the freedom to choose how they move through it.

The museum Riverfront is one of six current projects reshaping the Grand River, and Owen-Ames-Kimball Co. is proud to be part of three of them. Along with the museum, we, in collaboration with the City of Grand Rapids and Viridis Design Group are building Canal Park, opening in late fall, and the East Riverfront Park near the new Acrisure Amphitheater, now in Phase II. Both add kayak launches and river access that this stretch of the Grand hasn't offered in generations, opening the water back up to the community.

Video by Taproot Pictures

August 4, 2026
Learn More