O‑A‑K MI Welcomes 20 New Employees in 2022

January 26, 2023

O‑A‑K MI Welcomes 20 New Employees in 2022

Play Video

(Grand Rapids, MI) January 24­, 2023– Owen‑Ames‑Kimball Co. (O‑A‑K), local professional construction firm, announces the additions of Danielle Becklin, Eugene Blesing, Shane Crow, Dan Dennis, Sandy Dyer, Jeremy Fron, Josh Hoch, Lucas Kleyn, Josh Kwiatkowski, Joe Lighthart, Alyson Lloyd, Dennis Loveland, Robert Miller, Nick Morrissey, Tatiana Parsons, Chase Pattison, Ryan Pendrick, Ryan Ruiter, Nate Stader, and Wayne Vandawater.

Danielle Becklin, Marketing Manager, joins O‑A‑K’s Marketing department and holds a Bachelors in Communication from Michigan State University, alongside 10+ years of specialized construction marketing experience.

Eugene Blesing, Project Superintendent, has over 30 years of experience in the construction industry. He holds a grade 5 Water Operator license and is First Aid/CPR certified. He is currently on-site at Byron Center Intermediate 5/6 School.

Shane Crow, Project Superintendent, joins O‑A‑K with over 15 years of industry experience and an impressive portfolio of work that spans across various markets. He is currently on-site at Tri County Elementary School but will be moving to Lakeview Schools soon.

Dan Dennis, Project Superintendent, joins O‑A‑K’s team with 25 years of experience. He is a certified Licensed Residential Builder and a Private Pilot in his free time. He is currently working on-site at Rockford’s Crestwood Elementary School.

Sandy Dyer, Accounting, joins the accounting department in the Grand Rapids office. She has an associate degree from Grand Rapids Community College. In her free time, she loves to travel and do a variety of crafts.

Jeremy Fron, Carpenter, has 21 years of construction experience. He has his OSHA 30-Hour and is currently on-site at Van Andel Institute. In his free time, he enjoys hunting and fishing.

Josh Hoch, Project Superintendent, has 20 years of experience in the trades as a structural steel worker. He is currently working at Kenowa Hills Middle School and the turf field and track resurfacing project.

Lucas Kleyn, Assistant Project Superintendent, graduated from Ferris State University with a bachelor’s in construction management. After completion of his summer internship with O‑A‑K, Lucas has officially joined the O‑A‑K team and can now be found on-site at Godfrey-Lee Middle/High School. He holds his Michigan Builders License and is First Aid, CPR, AED, and Procore certified.

Josh Kwiatkowski, Project Superintendent, brings over 10 years of experience in the construction industry and is both OSHA 30-Hour and CPR/First Aid certified. He is working on-site at the Kent County Correctional Facility. Josh is both OSHA 30-Hour and CPR/First Aid certified. He is currently on-site at Kent County Correctional Facility.

Joe Lighthart, Assistant Project Superintendent, has over 20 years of experience in residential construction and previously owned and operated his own tiling company. Joe is currently on-site at Rockford Public Schools Aquatic project.

Alyson Lloyd, Project Superintendent, officially joins our Grand Rapids team after being an intern for the summer and finishing her Bachelors degree in Construction Management from Ferris State University. She is currently on-site at Kent Intermediate School District Lincoln campus.

Dennis Loveland, Project Superintendent, backed by over 41 years of experience and an extensive resume that spans across various market sectors.

Robert Miller, Project Superintendent, joined O‑A‑K with 40+ years of construction experience and has served a variety of roles within the industry, including carpenter, mechanic, and Forman. He is currently on-site at Elk Rapids middle school project.

Nick Morrissey, Project Superintendent, graduated from Ferris State University with a bachelor’s in construction management. He has 13 years of construction experience, including eight years as an Engineer in the United States Army. Nick is currently on-site at East Kentwood High School Culinary Arts addition.

Tatiana Parsons, Billing Specialist, joins our Grand Rapids office after graduating with her masters from Grand Valley State University. With her employment, she has acquired her public notary license and become a member of the Construction Financial Management Association (CFMA).

Chase Pattison, Project Superintendent, graduated from Grand Valley State University with a B.B.A. in Supply Chain Management and supervising construction at Elk Rapids Cherryland Middle School. Chase has acquired an impressive list of certifications including; OSHA 30-Hour, MI Stormwater Management Operator, Aerial Lift/All Terrain Certified, Masonry Fall Zone training, Lead/Asbestos Awareness training and CPR/First Aid certified.

Ryan Pendrick, Assistant Project Manager, joins the team as a recent graduate and former hockey player of Ferris State University. He has earned both an associate’s degree in Architectural Technology and a Bachelors in Facility Management.

Ryan Ruiter, Assistant Project Superintendent, served as intern for the last two consecutives summers with O‑A‑K and became an official team member following his graduation at Hope College. Ryan is currently on-site at Forest Hills Administration Building.

Nate Stader, Project Superintendent, comes with 13 years of experience in a variety of construction field and a Bachelors in Science, in Construction Management from Ferris State University. He is currently on-site at Kentwood Public Schools, Endeavor Elementary School.

Wayne Vandawater, Project Superintendent, joins the Grand Rapids team with over 37 years of industry experience along with a handful of qualifications, including OSHA-30 Hour certified, Aerial and platform lift certification as well as CPR/First Aid certified. He is currently on-site at the new Rockford Elementary School.

""

Related Stories

New Spaces for a New School Year at McGlone Academy

This summer, O-A-K completed renovations for Denver Public Schools at McGlone Academy, improving several of the spaces students use every day.

The work touched nearly every part of the student experience. In the cafeteria and kitchen, a new walk-in cooler and freezer will help support daily food service. In the theater, renovations and a new wheelchair lift make performances and assemblies more accessible. The gym received new athletic flooring, multi-sport court markings, and safety padding, while an additional classroom and storage space provide more room for learning and day-to-day school needs.

Behind the walls, O-A-K also upgraded important mechanical and electrical systems, including chilled-water pumps, electrical panels, and transformers, helping improve the reliability of the building itself.

With classrooms and hallways quieter over the summer, O-A-K's team got to work completing renovations throughout McGlone Academy before students and teachers returned. With the new school year underway, students came back to updated classrooms, a ready-to-use gym and theater, and the spaces they rely on throughout their school day.

August 21, 2026
Learn More

Through the Fence: Woodland Elementary Students Get a Look at Their New School

Woodland Elementary staff and students recently traded their classroom for hard hats. From a safe distance behind the fence line, they got a firsthand look at the jobsite where their new school is taking shape. The visit, known as a fence tour, was led by Anastasia Wojcik, project manager with Owen-Ames-Kimball Co. (O-A-K), and Jennifer Carson, principal at Woodland Elementary.

"It's great for them to be able to see the people on site, equipment moving around, and really get a sense of what's happening here," Carson said.

Teachers also used the visit to bring a classroom lesson to life, connecting the tour to a unit on area and perimeter.

The new Woodland Elementary is part of Portage Public Schools' Building the Future of Learning bond program, approved by voters in 2021. The building is being designed around an enchanted forest theme, with natural materials and abundant daylight. Learn more about the ground breaking here.

While construction continues, staff and students are temporarily housed at the former Haverhill Elementary building. Woodland is scheduled to open in fall 2027, the first of three new Portage elementary schools opening in three consecutive years, followed by Amberly in 2028 and Angling Road in 2029.

Thank you to our partners: Portage Public Schools, TowerPinkster, Plante Moran, Fielding International, and Video Partner Taproot Pictures.

August 12, 2026
Learn More

A Classroom Without Walls: The Grand Rapids Public Museum's New Riverfront

At the Grand Rapids Public Museum, learning now happens outside, right on the banks of the Grand River. The museum's new Riverfront brings an outdoor classroom and reopened public access to the water, so students and families can explore the geology, ecology, and history of the river in the very landscape they're studying.

The Riverfront is part of the museum's Expanding Curiosity mission, which takes learning beyond the gallery walls and out to the riverbanks. The broader project, funded through public-private partnerships, added overlooks, hands-on environmental exhibits, improved access to the water's edge, and a connection to the Grand River Greenway, an 85-mile non-motorized trail system.

Each summer, roughly a thousand children visit the museum, and many now spend part of their day along the riverfront. Nearby, a layered Geology Wall recreates six types of stone found in the ground beneath Kent County. Educators use it to talk about the history of the rapids and how the limestone was mined from the area, with the real strata visible in the wall behind them.

Just as important is what the space reconnects. For years, retaining walls cut the museum off from the river below. Now a sidewalk and stone steps lead down to the water's edge, opening the river back up to the people who come to learn from it. Groups gather to collect water samples and study the insects that live in the river, and visitors have already put the space to use for fishing.

Accessibility shaped the design throughout. Rather than a single accessible route, the space offers multiple points of access, giving every visitor the freedom to choose how they move through it.

The museum Riverfront is one of six current projects reshaping the Grand River, and Owen-Ames-Kimball Co. is proud to be part of three of them. Along with the museum, we, in collaboration with the City of Grand Rapids and Viridis Design Group are building Canal Park, opening in late fall, and the East Riverfront Park near the new Acrisure Amphitheater, now in Phase II. Both add kayak launches and river access that this stretch of the Grand hasn't offered in generations, opening the water back up to the community.

Video by Taproot Pictures

August 4, 2026
Learn More