Owen‑Ames‑Kimball Hosts Topping Off Event at New Lehigh Acres Middle School

October 6, 2020

Owen‑Ames‑Kimball Hosts Topping Off Event at New Lehigh Acres Middle School

Play Video

Owen‑Ames‑Kimball Company (O‑A‑K), a preeminent general contractor with a longstanding presence in Southwest Florida, hosted a topping off ceremony for the new Lehigh Acres Middle School on Wednesday, September 23. A topping-off ceremony is held when the last beam is placed atop a structure during construction. Approximately 1,400 students enrolled at Lehigh Middle will move into the new facility located at 651 Sunrise Boulevard in Lehigh Acres in fall 2021. O‑A‑K is the construction manager for the project.

Attendees included Lee County School Board members, Lee County Schools administration, Lehigh Acres Middle School administration, area elected officials and representatives from the construction team, architects, engineers and inspectors. Attendees were provided with Lehigh Acres Middle School themed masks and hand sanitizers and social distancing was practiced.

“The new Lehigh Acres Middle School will not only help us serve the exploding population here in the East Zone, but it will also offer innovative opportunities that will prepare our students for high school, college and career with world-class academics and programs,” said Lee County School Board Member Gwynetta S. Gittens.

After the topping off ceremony, O‑A‑K provided lunch for more than 200 subcontractors that have worked on the project.

“We are pleased to be a part of this project that will accommodate the rapidly-growing population of students in Lee County,” said Dave Dale, president of O‑A‑K Florida. “We also want to recognize and thank the men and women who have worked so hard to build this state-of-the-art facility.”

The 167,000 square foot facility on 42.53 acres has a total construction cost of nearly $43,000,000. The site will accommodate Elementary School J in the future, and the schools will share an access road, bus loop, and central energy plant. The campus will have 30 classrooms and 16 labs.

The 502 seat gymnasium building will serve a dual purpose as a hurricane shelter. It will be built to Code Council/National Storm Shelter Association Standard for Design and Construction of Storm Shelters (ICC-500) requirements. The cafeteria will be equipped for emergency power to help supply services during an emergency event. The school will include updated security measures, including a single point of entry access control and upgraded hardware on all classroom doors.

Academic programs at the school include the 6th-grade academy that provides a smooth transition while nurturing 6th-grade scholars through this critical period by providing a more supportive instructional environment. The Advancement Via Individual Determination (AVID), an "untracking" program, is designed to help underachieving students with high academic potential prepare for entrance to colleges and universities. The Cambridge International Program is an advanced, rigorous curriculum that prepares students for life; and a gifted program.

Lehigh Acres Middle is a premier STEAM (Science, Technology, Engineering, Arts and Mathematics) school. STEAM is a 21st Century approach to learning that involves these disciplines that are integrated into all subject areas.

The O‑A‑K project manager is Alesha Watchowski, and the site superintendent is Tim Harkins. The project architect is RG Architects, P.A. Johnson Engineering is the civil engineer, and TLC Engineering Solutions is the mechanical, electrical, and plumbing engineer. The structural engineer is TRC Worldwide Engineering.

O‑A‑K’s Florida operation is an affiliate of its parent company located in Grand Rapids, Michigan. The Florida operation has offices in Collier and Lee counties. Its Lee County office is located at 11941 Fairway Lakes Drive in Fort Myers. Learn more about O‑A‑K at www.owen‑ames‑kimball.com.

"We are pleased to be a part of this project that will accommodate the rapidly-growing population of students in Lee County."
Dave Dale
Florida Division President
Owen‑Ames‑Kimball

Related Stories

New Spaces for a New School Year at McGlone Academy

This summer, O-A-K completed renovations for Denver Public Schools at McGlone Academy, improving several of the spaces students use every day.

The work touched nearly every part of the student experience. In the cafeteria and kitchen, a new walk-in cooler and freezer will help support daily food service. In the theater, renovations and a new wheelchair lift make performances and assemblies more accessible. The gym received new athletic flooring, multi-sport court markings, and safety padding, while an additional classroom and storage space provide more room for learning and day-to-day school needs.

Behind the walls, O-A-K also upgraded important mechanical and electrical systems, including chilled-water pumps, electrical panels, and transformers, helping improve the reliability of the building itself.

With classrooms and hallways quieter over the summer, O-A-K's team got to work completing renovations throughout McGlone Academy before students and teachers returned. With the new school year underway, students came back to updated classrooms, a ready-to-use gym and theater, and the spaces they rely on throughout their school day.

August 21, 2026
Learn More

Through the Fence: Woodland Elementary Students Get a Look at Their New School

Woodland Elementary staff and students recently traded their classroom for hard hats. From a safe distance behind the fence line, they got a firsthand look at the jobsite where their new school is taking shape. The visit, known as a fence tour, was led by Anastasia Wojcik, project manager with Owen-Ames-Kimball Co. (O-A-K), and Jennifer Carson, principal at Woodland Elementary.

"It's great for them to be able to see the people on site, equipment moving around, and really get a sense of what's happening here," Carson said.

Teachers also used the visit to bring a classroom lesson to life, connecting the tour to a unit on area and perimeter.

The new Woodland Elementary is part of Portage Public Schools' Building the Future of Learning bond program, approved by voters in 2021. The building is being designed around an enchanted forest theme, with natural materials and abundant daylight. Learn more about the ground breaking here.

While construction continues, staff and students are temporarily housed at the former Haverhill Elementary building. Woodland is scheduled to open in fall 2027, the first of three new Portage elementary schools opening in three consecutive years, followed by Amberly in 2028 and Angling Road in 2029.

Thank you to our partners: Portage Public Schools, TowerPinkster, Plante Moran, Fielding International, and Video Partner Taproot Pictures.

August 12, 2026
Learn More

A Classroom Without Walls: The Grand Rapids Public Museum's New Riverfront

At the Grand Rapids Public Museum, learning now happens outside, right on the banks of the Grand River. The museum's new Riverfront brings an outdoor classroom and reopened public access to the water, so students and families can explore the geology, ecology, and history of the river in the very landscape they're studying.

The Riverfront is part of the museum's Expanding Curiosity mission, which takes learning beyond the gallery walls and out to the riverbanks. The broader project, funded through public-private partnerships, added overlooks, hands-on environmental exhibits, improved access to the water's edge, and a connection to the Grand River Greenway, an 85-mile non-motorized trail system.

Each summer, roughly a thousand children visit the museum, and many now spend part of their day along the riverfront. Nearby, a layered Geology Wall recreates six types of stone found in the ground beneath Kent County. Educators use it to talk about the history of the rapids and how the limestone was mined from the area, with the real strata visible in the wall behind them.

Just as important is what the space reconnects. For years, retaining walls cut the museum off from the river below. Now a sidewalk and stone steps lead down to the water's edge, opening the river back up to the people who come to learn from it. Groups gather to collect water samples and study the insects that live in the river, and visitors have already put the space to use for fishing.

Accessibility shaped the design throughout. Rather than a single accessible route, the space offers multiple points of access, giving every visitor the freedom to choose how they move through it.

The museum Riverfront is one of six current projects reshaping the Grand River, and Owen-Ames-Kimball Co. is proud to be part of three of them. Along with the museum, we, in collaboration with the City of Grand Rapids and Viridis Design Group are building Canal Park, opening in late fall, and the East Riverfront Park near the new Acrisure Amphitheater, now in Phase II. Both add kayak launches and river access that this stretch of the Grand hasn't offered in generations, opening the water back up to the community.

Video by Taproot Pictures

August 4, 2026
Learn More